Ground-mounted and hybrid parks at a scale rooftop can't reach: land acquisition, HT evacuation and grid interconnection managed end to end, for IPPs and open-access buyers procuring power off-site. The same engineering discipline applies at scale, one plant head described a site with rock, a monsoon window and a 0.5 km HT run engineered around, and still commissioned in under 90 days.
What this covers
- Land acquisition, HT evacuation and grid interconnection managed end to end, not handed off mid-project.
- Open-access and group-captive structures for buyers who want scale without owning generation directly.
- Performance-linked (GLG) structures available where generation is tied to defined benchmarks.
- The same investment-grade financial model, IRR, payback, depreciation, applied at utility scale.
Commercial models that apply
Open Access & Group Captive
Off-site solar and hybrid power procured through open-access and group-captive structures, lower landed cost, scalable across facilities.
- Large-scale energy sourcing
- Equity participation structure
- Multi-location power allocation
- Compliance with captive regulations
Generation-Linked Performance (GLG)
Performance-driven models where generation is aligned to defined benchmarks, accountability and predictable outcomes across the asset life.
- Performance-linked assurance
- Reduced operational risk
- Predictable energy output
- Financial-outcome alignment
End-to-end EPC & lifecycle O&M
One point of accountability from feasibility and design through commissioning, SCADA monitoring and long-term operations & maintenance.
- Engineering to execution
- SCADA monitoring and analytics
- Long-term O&M support
- Consistent performance across asset life


