- Location
- India
- Year
- 2025
- Commercial Model
- CAPEX
- Type
- Ground-Mounted Solar
- Capacity
- 1.10 MWp
- Annual Generation
- 14.5 lakh units / year
- Effective Savings
- ≈ ₹13.8 lakh / year (€12.8K)
Terrain engineering with partial rock excavation and 11 kV HT evacuation over 0.5 km, delivered in 85 days through the monsoon.
Highlights
- Carried out controlled terrain engineering, including partial rock excavation and land levelling, to make the site suitable for solar installation.
- Engineered a site-specific layout and foundation strategy to ensure structural stability despite uneven and rugged land conditions.
- Designed and executed 11 kV HT power evacuation over 0.5 km, enabling reliable grid injection from a remote plant location.
- Installed dedicated HT transmission infrastructure with green poles, ensuring safe and compliant long-distance power transfer.
- Delivered the project in a record timeline of 85 days, despite heavy rainfall, a remote/outskirt site and continuous operation within a dust-intensive stone-crusher environment.
- Engineered the system for harsh industrial conditions, ensuring durability, reliability and long-term performance.